top of page
Geelong Coatings
SDC15744
SDC15717
IMG_0454
SDC15744
1/4
food production factory
This project consisted of complete removal of the existing failed floor coatings, installation of floor drain, concrete purging chemical application to remove deep fat saturation of existing substrate, and finally installation of an R10 non slip resin floor topping to withstand the demanding production requirements.
We were able to deliver the client a fast return to service and a floor that will last them for the life of the building.
bottom of page